<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Aurea Build — Insights</title>
    <link>https://aureabuild.co/insights</link>
    <description>Practical notes on residential construction in Austin, Texas.</description>
    <language>en-us</language>
    <lastBuildDate>Mon, 31 Aug 2026 12:00:00 GMT</lastBuildDate>
    <atom:link href="https://aureabuild.co/feed.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>What actually drives the cost of a renovation?</title>
      <link>https://aureabuild.co/insights/what-drives-renovation-cost</link>
      <guid isPermaLink="true">https://aureabuild.co/insights/what-drives-renovation-cost</guid>
      <description>The size of the property tells only part of the story. Existing conditions, project complexity, material selections and the depth of the work have a greater effect on cost.</description>
      <pubDate>Wed, 26 Aug 2026 12:00:00 GMT</pubDate>
    </item>
    <item>
      <title>Where should investors spend, and where should they hold back?</title>
      <link>https://aureabuild.co/insights/where-investors-should-spend</link>
      <guid isPermaLink="true">https://aureabuild.co/insights/where-investors-should-spend</guid>
      <description>The right scope depends on the exit — flip, lease or long-term hold. How to prioritise improvements without overbuilding for the property or the market.</description>
      <pubDate>Wed, 26 Aug 2026 12:00:00 GMT</pubDate>
    </item>
    <item>
      <title>How to compare renovation bids</title>
      <link>https://aureabuild.co/insights/how-to-compare-renovation-bids</link>
      <guid isPermaLink="true">https://aureabuild.co/insights/how-to-compare-renovation-bids</guid>
      <description>Two bids can show very different totals because they include different scopes, assumptions, allowances and exclusions. Here is what to review before choosing a contractor.</description>
      <pubDate>Wed, 26 Aug 2026 12:00:00 GMT</pubDate>
    </item>
  </channel>
</rss>
